Construction begins on new Active Learning Center at South Campus Library

Effective March 2, 2015, access to the Middle (3rd) Floor of the Health Sciences Digital Library and Learning Center is no longer available as construction on the future Active Learning Center begins. All Library clients should be aware that increased noise during business hours may result from the construction.

Please note: the construction also requires closing the Library’s central staircase, so access to the Library Administration Suite (E3.314) and the Top (4th) Floor needs to be redirected, as follows:

  • To pick up Interlibrary Loan materials and access the Library Administration Conference Room during business hours, refer to the map below for location and instructions.
  • To access the 4th Floor Quiet Study area, use the Library Elevator.
  • To return Interlibrary Loan materials, use the Main Floor Interlibrary Loan Dropbox.

Construction is expected to be completed in July 2015, in anticipation of the new Medical School curriculum implementation. The North Campus Branch Library (ND2.300) is available as an alternate study location with 24/7 quiet study as well as clinical, Library, and student computer workstations.

Leave a Reply